Matarbari Deep Mixing Method
Project Profile
Name: Matarbari Deep Mixing Method
Location: Chittagong Matarbari, Bangladesh
Method: Deep Cement Mixing Pile(DCM)
Construction duration
From: 2017.12
To: 2021.04
The Project of Matarbari coal-fired power plant in Bangladesh adopts the deep cement mixing pile (DCM)construction method, which is used for road foundation treatment in the factory. The minimum treatment depth is 4.5m, the maximum treatment depth is 16m, and the total project volume is about 2,160,000 m3.The treatment effect is excellent and the core integrity rate on site reaches 100%.