Guangdong Zhanjiang Orimulsion Power Plant

Guangdong Zhanjiang Orimulsion Power Plant


e1a26b2b7707e2fe9ff75921a441ee1b.jpg

The hydraulically filled fly ash foundation (320,000 m2) of Guangdong Zhanjiang Aoli Oil Power Plant, after 90 days of construction by HVDM, the bearing capacity of fly ash has been rapidly increased by 3-4 times, with a characteristic value of 120kPa and a treatment depth of 6 meters; Phase II Continue to use this construction method.